ST52VF

Summer holidays:
Every year Chambrelan remains open during the summer holiday period.
During this time we continue to ship stock orders from our UK base overnight or in 2 - 3 days from our factory stock.
However, please be aware that the manufacturing lead time for non-standard items and large volume orders may increase during this period.

 
Chambrelan  -  -  - ST52VF

Closed length
 
Extension
 
Load per pair
on major axis
Load per pair
on minor axis
Stock
 

CAD Files


 

  Slide
Partial extension
Slide
Total extension
Slide
Over extension
Rail
Linear Rails

Aluminium

- - - -

Steel

R53
RA5R
RA554
-

Stainless

- ST509
- -